Please update your Flash Player to view content.

4x4Wire is for you, your 4x4 and access issues that interest four-wheelers
You, your 4x4, access issues, places to go and more outdoor topics

Ongoing discussion of recreational and environmental issues for four-wheelers
Ongoing discussion of recreation and environmental issues affecting California

Environmental news and information for recreation advocates
Environmental news and information for recreation advocates

Discussion forums covering a variety of 4x4 model technical issues and general recreation topics
Discussion forums covering 4x4 technical issues and general recreation topics


Search 4x4Wire for more on OHV recreation and 4x4 Tech

Recreation Advocate

The OutdoorWire family websites feature news and information affecting outdoor recreation opportunities and access to public lands. 

Public Meetings, Comment Period Set for Stirling Energy Solar Two Project Near El Centro

The Bureau of Land Management (BLM) and the California Energy Commission (CEC) have announced a CEC staff workshop/BLM public meeting on the draft environmental impact statement (EIS)/staff assessment (SA) for the Stirling Energy Systems Solar Two Project (also known as Imperial Valley Solar Project) on public land in Imperial County, Calif.

The workshop/public meeting will begin at 8 a.m., Monday, March 22, 2010, and if necessary, continue into Tuesday, March 23, 2010.  The meeting will be held at the San Diego Gas & Electric Renewable Center, 1425 W. Main St., El Centro, CA 92243.  In addition, the BLM plans to hold an open house public meeting in El Centro in early May.  The time and location will be announced later.

Stirling Energy Systems has applied for a right-of-way authorization to construct a solar power plant on 6,144 acres of public land about 14 miles west of El Centro.  The proposed 750-megawatt solar plant would provide enough electricity to power about 225,000 average California homes.  The plant would use SunCatcher solar-dish technology designed to automatically track the sun and focus solar energy onto a power conversion unit to generate electricity.  The project also includes a 10.3-mile 230-kilovolt transmission line, substation, water-supply pipeline, and access road.

The BLM, as the lead agency under the National Environmental Policy Act, and the CEC, as the lead agency under the California Environmental Quality Act, have jointly prepared the draft EIS/SA, which is available online at http://www.blm.gov/ca/st/en/fo/elcentro/nepa/stirling.html or http://www.energy.ca.gov/sitingcases/solartwo/documents/index.html.  The public may comment on these documents through May 26, 2010.

Further details can be found at the BLM renewable energy web page: http://www.blm.gov/ca/st/en/fo/elcentro/nepa/stirling.html and the CEC web page http://www.energy.ca.gov/sitingcases/solartwo/index.html or by contacting Jim Stobaugh, BLM project manager at (775) 861-6478, or This email address is being protected from spambots. You need JavaScript enabled to view it..

Thanks to 4X4
Draft Environmental Study Released for Palen Solar...
 

Comments

No comments made yet. Be the first to submit a comment

4x4Wire Posts List

OutdoorWire Websites

OutdoorWire

OutdoorWire

Portal page for OutdoorWire Access and Landuse Central Read More
4x4Voice

4x4Voice

California OHV recreation news and information Read More
MUIRNet News

MUIRNet News

News and information about outdoor recreation Read More
4x4Wire

4x4Wire

Off road recreation and news and information Read More
TrailTalk 
Forums

TrailTalk Forums

4x4Wire TrailTalk Forums for 4x4 tech information Read More
  • 1